HAP 6.4 (Hourly Analysis Program) Full

  • Full Version ✅
  • Supports Windows 7/8/8.1/10/11 ✅
  • 32/64 bits compatibility ✅
  • Single computer activation ✅
  • LIFETIME activation guaranteed ✅
  • Install guide is included ✅
Tags: , , , ,

$180.00 $120.00

Description

HAP 6.4 (Hourly Analysis Program) Crack

Carrier Hourly Analysis Program (HAP) is a comprehensive commercial HVAC engineering software suite used to calculate peak heating and cooling loads and simulate 8,760-hour building energy performance. Designed by Carrier for mechanical engineers, energy modelers, and design-build contractors, it streamlines system sizing, ductwork design, and LEED/ASHRAE compliance in a single integrated platform.

Core Capabilities

• Peak Load Calculation & System Sizing. Engineers model building geometry, local weather data, occupancy schedules, and internal heat gains to accurately determine peak heating and cooling loads, size air handlers and chillers, and estimate required airflow rates.
• 8,760-Hour Energy Simulation. The software performs full-year, hour-by-hour thermal and energy modeling to compare the operating costs, utility consumption, and carbon impact of different HVAC system designs and control strategies.
• 3D Visual Building Modeling (HAP v6). Users can sketch floor plans directly over imported CAD or PDF architectural drawings to generate three-dimensional building models, automatically calculating wall areas, roof orientations, and external shading.
• Compliance & Certification Reporting. HAP generates detailed, audit-ready documentation for ASHRAE Standard 90.1 compliance, LEED energy and atmosphere credits, and local building energy codes.

Ideal Users & Applications

• Consulting MEP Engineers. Used to size commercial HVAC equipment, verify thermal comfort across zones, and produce engineering reports for commercial, institutional, and industrial buildings.
• Energy Auditors & Sustainability Consultants. Used to evaluate energy conservation measures (ECMs), model HVAC retrofits, and perform life-cycle cost analyses to justify capital investments.
• Design-Build HVAC Contractors. Used to quickly compare system alternatives, optimize equipment selection, and validate equipment performance prior to installation.

0